{"id":118947,"date":"2015-07-22T09:57:53","date_gmt":"2015-07-22T14:57:53","guid":{"rendered":"http:\/\/www.bismarckcafe.com\/blogs\/?p=118947"},"modified":"2017-04-17T09:21:10","modified_gmt":"2017-04-17T14:21:10","slug":"basin-electric-remodeling-expanding-headquarters","status":"publish","type":"post","link":"https:\/\/www.bismarckcafe.com\/blogs\/118947\/basin-electric-remodeling-expanding-headquarters","title":{"rendered":"Basin Electric Remodeling &#038; Expanding Headquarters"},"content":{"rendered":"<p>Basin Electric is in the midst of a major remodeling and expansion effort to\u00a0their\u00a0sprawling Bismarck campus that, when completed, is expected to serve the utility cooperative&#8217;s operations\u00a0for the next fifty years.<\/p>\n<p>The current phase, which has already commenced, includes the\u00a0addition of 4,000 square feet and\u00a0the remodel of 4,700 square feet.\u00a0<span style=\"line-height: 1.5;\">Another, even larger, expansion is also being planned, which will add 90,000 square feet to the west side\u00a0of their headquarters. The larger expansion will consist of four floors that run the entire length of the current building. A glass atrium will then connected the two buildings.\u00a0<\/span><\/p>\n<p>Once fully approved and completed, the expanded building will be large enough to host all of their 550 local employees under the same roof. Currently, the company&#8217;s\u00a0local employees are spread out over four buildings. The organization\u00a0is one of the largest employers in Bismarck-Mandan.<\/p>\n<p>The\u00a0projects will also modernize the working environment for its employees, including the addition of nursing rooms for new mothers.<\/p>\n<p>Basin&#8217;s headquarters, situated along I-94\u00a0facing 19th Street, was constructed in 1974. The project is expected to be completed by 2017.<\/p>\n<p>Read more:<\/p>\n<ul>\n<li><a href=\"http:\/\/www.basinelectric.com\/News-Center\/Publications\/Basin-Today\/2015-0304-building-for-the-future.html\" target=\"_blank\">http:\/\/www.basinelectric.com\/News-Center\/Publications\/Basin-Today\/2015-0304-building-for-the-future.html<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Basin Electric is in the midst of a major remodeling and expansion effort to\u00a0their\u00a0sprawling Bismarck campus that, when completed, is expected to serve the utility cooperative&#8217;s operations\u00a0for the next fifty years. The current phase, which has already commenced, includes the\u00a0addition of 4,000 square feet and\u00a0the remodel of 4,700 square feet.\u00a0Another, even larger, expansion is also [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2680,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[518,2409,216,364],"tags":[1851,253,1063,1064],"class_list":["post-118947","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bismarck-news","category-business-news","category-featured","category-home-page","tag-basin-electric","tag-business","tag-home","tag-ticker"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/posts\/118947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/comments?post=118947"}],"version-history":[{"count":0,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/posts\/118947\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/media\/2680"}],"wp:attachment":[{"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/media?parent=118947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/categories?post=118947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bismarckcafe.com\/blogs\/wp-json\/wp\/v2\/tags?post=118947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}